REA Final - 22 Dec 20 - eBook - 1682 pages

DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF

EXHIBIT “A” Attachment to Agreement No. 1213126J-000.620027 dated July 16, 2018, by and between Spearhead Construction LLC. and Skanska/Walsh JV for Furnish and Install Building Framing & Partitions for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York. 2. All GFRG and GFRC Truss enclosures, ceilings, and soffits located on Level 4 of Pedestrian Bridge B. 3. Subcontractor shall furnish and install all gypsum board assemblies for Stairwell (STE-01) from Level 4 to Roof Level this is all considered public space. 4. Subcontractor shall furnish and install all framing and drywall partitions at fire shutter at column line B5’ including swing pocket detail and nested deployable egress door with magnetic hold open catch per A84- 73-00-00-00. Framing and Drywall to be coordinated with Overhead coiling door with integral egress door vendor. 5. Subcontractor shall furnish and install all framing and drywall enclosures at retail header enclosure and coordinate framing with manually operated folding security system track along BR Line as shown on A21- AJ-4L-BG-6C and A84-74-00-00-00. 5.0 ALTERNATES: See Exhibit C Pricing of alternates will be stated on the adds and deducts in Exhibit C. Subcontractor’s cost is understood to express all items required to incorporate the alternate add to or deduct price from the Subcontract Price for the work required, including General Conditions, Overhead and Profit, and other cost impacts to integrate the alternate scope change into the Subcontractor’s Scope of Work.

Exhibit A

page 19 of 19

SWJV Pr. No. 1213126-000

Made with FlippingBook - professional solution for displaying marketing and sales documents online