REA Final - 22 Dec 20 - eBook - 1682 pages
DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF
EXHIBIT “A” Attachment to Agreement No. 1213126J-000.620027 dated July 16, 2018, by and between Spearhead Construction LLC. and Skanska/Walsh JV for Furnish and Install Building Framing & Partitions for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York. Key Personnel: Subcontractor and Contractor agree that Subcontractor is responsible to engage competent supervisory and superintendent personnel on the Project pursuant to Exhibit E, Article 7.2, and Subcontractor will notify Contractor prior to any changes to its “Key Personnel” designated for this Project. In the event Subcontractor changes any of its Key Personnel, Subcontractor will have fifteen (15) days from the date of the change to appoint a replacement, and Contractor will have fifteen (15) days thereafter to provide written notice of its objections, but the failure to object will be deemed Contractor’s approval of the change. In the event that Subcontractor fails to cure within such time, the Contractor will be entitled to withhold payments due or to become due under the Subcontract until Subcontractor cures by the appointment of replacement personnel approved by Contractor. Contractor’s approval will not be unreasonably withheld, conditioned, or delayed if the proposed replacement possesses equal or greater experience, skill, knowledge, and professional expertise in the relevant fields than the individual being replaced. H.
“Key Personnel” means and includes the following persons: Andee Hidalgo, Owner Sean Reed, Project Manager Rose Ott, COO Gary Miuccio, Superintendent
3.0 ALLOWANCES: Allowance work stated below is included in the Subcontract Price. Allowance work will be reimbursed on a direct cost basis for actual materials and labor hours expended. Work will be tracked in accordance with Subcontract provisions relating to changes in work. The Skanska/Walsh JV reserves the right to direct the Subcontractor to complete other work outside of the work specifically defined in the Allowance. A. Subcontractor may only accrue cost charges against the allowances when directed and authorized by Skanska/Walsh JV in writing to the Subcontractor. B. The allowance values included in the Subcontract Price will be adjusted with an add or a deduct based on the actual costs incurred and is subject to Skanska/Walsh JV’s authorization. C.The following items are being carried as Allowances in the Scope of Work and will be included based on the following criteria.
ALLOWANCE SCOPE: 1. Furnishing and install access doors/panels (including metal framing) - $10,000 4.0 ITEMS NOT INCLUDED:
1. All drywall framing, partitions, walls, ceilings on Level 4 from Head House to Concourse B including Elevator Control Room (CB4L-501), Mechanical Room (CB4L-500), Roof Access Corridor (CB4L-502), Level 4 Elevator Lobby and shaft wall.