REA Final - 22 Dec 20 - eBook - 1682 pages
DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF
EXHIBIT “A” Attachment to Agreement No. 1213126J-000.620027 dated July 16, 2018, by and between Spearhead Construction LLC. and Skanska/Walsh JV for Furnish and Install Building Framing & Partitions for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York. sound or thermal ratings. 9. Installation of HollowMetal Door Frames to meet specified tolerances to insure fit-up of doors, finish hardware and other accessories or devices meets Technical Specification requirements. Locations not complying and meeting requirements will be removed and replaced by Subcontractor at its expense. 10. Provide any and all testing including any push pulls testing of doors and hardware. 11. Subcontractor shall provide any means of hoisting and moving doors and hardware received from SWJV to location of installation. 12. Subcontractor includes all Services for ongoing adjustments / maintenance per Specifications for period stated. Final adjustment and any latching and hardware to work properly prior to turnover. P. Access Doors and Frames: Subcontractor includes the following concerning Access Doors and Frames which to be billed using the Access Door Allowance 1. Furnish and install access doors and panels in accordance with Contract Documents. Installation will comply with Specifications and manufacturer’s instructions. 2. Furnish and install all Access Panels shown in floor plans, elevations, reflected ceiling plans and details in the Contract Documents and includes: a) Ceiling Access Panels including framing and support within suspension system. b) Wall access panels at Rated Shaft and Wall locations. c) Assemblies to be functional at location for swing, size, rating, security access and function with adjacent finishes or assemblies. d) Include added backing, framing at head, jamb, sill or perimeter of access panel. e) When access is for MEP devices, panels, and valves or in wall system components, this Subcontractor will coordinate with Other Trades to insure access panel size and location. f) Convenience Outlet Access Panel Q. Specialties: Subcontractor includes Install (specialties furnished by others), the following concerning specialties in accordance with Contract Documents. Installation will comply with Specifications and manufacturer’s instructions. a) Wall and Door Protection b) Emergency Access and Information Cabinets c) Emergency Aid Specialties d) Defibrillator Cabinets e) Fire Protection Specialties, cabinets and extinguisher
1.04 General Scope Description : The following are general provisions for executing the Work and applicable at all levels of performance and execution by the Subcontractor.
1. Fire Rating / STC Rating / Thermal: All provisions and requirements to achieve Fire-Rating, STC Rating or Thermal Rating requirements. 2. Substrate Interface with Final Finishes: Special attention to the Architectural Finishes applied over or adjacent to this Subcontractor’s Work to insure Work such as taping, finish level, loads, layout, allowable tolerances, configuration and impact to “Quality” installation of Final Architectural Finishes is included this Subcontractor’s execution of Work.
Exhibit A
page 13 of 19
SWJV Pr. No. 1213126-000
Made with FlippingBook - professional solution for displaying marketing and sales documents online