REA Final - 22 Dec 20 - eBook - 1682 pages

DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF

EXHIBIT “A” Attachment to Agreement No. 1213126J-000.620027 dated July 16, 2018, by and between Spearhead Construction LLC. and Skanska/Walsh JV for Furnish and Install Building Framing & Partitions for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York. reinforcing plates or backing plates and support systems at MEP and Fire Sprinkler openings, security cameras, strobes, speakers, life safety devices, supports, or other pre- fabricated assemblies. L. Insulation Systems: Subcontractor to furnish and install Thermal and Acoustical Insulation to achieve the “R” rating or “STC” rating in thickness and types specified at locations required in the Contract Documents including vapor retarder adhesive, fasteners and other accessories required. 1. Install insulation at vertical walls, soffits, ceilings, and locations noted in metal frame systems, interior partitions, gypsum board ceilings systems, soffits, and suspended framing. 2. Install insulation in cavities and spaces behind Subcontractors wall assemblies or above ceiling assemblies. 3. Install insulation at horizontal transitions in walls systems and lay-on locations on top of gypsum board ceiling systems. 4. At furred wall conditions install insulation from floor to bottom of deck above as shown. 5. Accessories: Include impaling pins, shields, mounting plates, adhesives, and other manufacturer required items for a complete installation. 6. Allow provisions around pipe, conduit, chases, structural or panel connections, or other access systems to maintain the thermal, fire rating or sound rating values or performance. 7. Include all INS05 compressed to fill openings. Insulation continuous, fire and smoke rated sealant system per contract documents. M. Joint Sealants: Subcontractor to furnish and install all joint sealants related to this Subcontractor’s Work in accordance with Contract Documents. 1. Install joint sealants where: a) This Subcontractor’s Work creates joint between its Work and existing adjacent surface, substrate or installation installed by Other Trades (e.g., joints finishing to CMU partitions or assemblies, Concrete floors/columns/walls/beams, precast decks, panels, walls, structural shapes or angle, at SOFP systems, aluminum frames, metal framing, or backing, expansion joints, door frames, equipment, header walls, cabinets, or locations where this Subcontractor’s work finishes to other substrates). b) Joints created within and between the installed elements of this Subcontractor’s Work. 2. Acoustical sealants for exposed or concealed joints as specified. 3. All interior joints within Subcontractor’s systems. 4. Provide in colors as specified. 5. The joint application and finishing methods will meet Quality Expectations for this Project. 6. Subcontractor to provide and acquire approval of joint finishes and methods for application, tooling and finish to establish a baseline for the Project. 7. For all STC/Smoke requirement relating to Gypsum Board Assemblies. N. Firestopping: Subcontractor to furnish and install the Firestopping related to this Subcontractor’s Work in accordance with Contract Documents. 1. Install at perimeter boundary (top, bottom, vertical) and joints in Fire rated walls, enclosures, assemblies and smoke barriers. 2. Firestop, fire-safing and fire-resistive sealants at top of fire-rated partitions, rated shaft walls, rated furred walls, rated duct enclosures, transition between structural steel, concrete, precast,

Exhibit A

page 11 of 19

SWJV Pr. No. 1213126-000

Made with FlippingBook - professional solution for displaying marketing and sales documents online