BC 024
BACK CHARGE - Punchlist Cost to Perform Open Items
($14,231)
Jun-20
BC 026 BC 027 BC 028 4
BACK CHARGE - Elevator Operator Time - Shaft Wall BACK CHARGE - Elevator Operator Time - Firestopping BACK CHARGE - Elevator use for Material, Equipment, Personnel SUBTOTAL BACK CHARGES FOR OUT OF SCOPE WORK / NOT SPEARHEAD WOR
K ($13,395) ($5,358) ($6,698) ($174,691)
Jun-20 Jun-20 Jun-20
BC 003
BACK CHARGE - BK Diner Framing
($55,000)
Jun-20
BC 022
BACK CHARGE - Elevator Shaft Walls
($20,700)
Jun-20
BC 029
BACK CHARGE - Firestopping performed by others
($11,332)
Feb-20
Jun-20
BC 025 BACK CHARGE - Hanging Scaffold for Level 4 Ceiling Base Contract Scope
($87,658)
Aug-19
Jun-20
Summary
SWJV Back Charge
Spearhead Credit
Total
($615,313)
($26,775)
Back Charges Not Disputed
BC 007 – Reduced GFRC Scope at Flairs
($7,750)
See: BC - 07 GFRC Base Credit.pdf Spearhead did not install GFRC at flairs and previously provided the credit amount ($7,750) to SWJV.