REA Final - 22 Dec 20 - eBook - 1682 pages
2. Spearhead revised BCs 2, 4, 10, 16 due to erroneous calculations. 3. Spearhead disputes BCs 5, 8, 9, 11-15, 17-21,23, 24, 26-28 as lacking legitimate supporting documentation. Said differently, SWJV would never accept a request for payment using any of the provided documents as proof or evidence of BCs. 4. Spearhead disputes BCs 3, 22, 25, and 29 because these BCs were not in Spearhead’s scope of work.
Spearhead Construction, LLC * PO Box 575 * Fort Montgomery, NY 10922
Spearhead Summary of Back Charges 12/7/20
Item # Item Description
SWJV Back Charge
Spearhead Credit
Item Start
BC Issued
NS
($7,570) ($55,501)
1 BC 007 2 BC 006
SUBTOTAL BACK CHARGES NOT DISPUTED CREDIT - Reduced GFRC Scope at Flairs SUBTOTAL BACK CHARGES WITH REVISIONS DUE TO ERRONEOUS CALCULATIO
($7,570) ($7,570) ($19,205)
BACK CHARGE - HOK Engineering Cost BBH
($1,531)
($338)
BC 002
BACK CHARGE - Lull Use (October & November)
($12,200)
($5,200)
Oct-19
Jun-20
BC 004
BACK CHARGE - Shanty Rental - Conex Box
($3,200)
($2,800)
Apr-19
Jun-20
BC 010
BACK CHARGE - Lull Use (Dec-April)
($30,200)
($7,400)
Dec-19
Jun-20
BC 016
BACK CHARGE - Power to Panel Max Machine
($8,370)
($3,467)
Dec-19
Jun-20
3 SUBTOTAL BACK CHARGES LACKING SUFFICIENT DOCUMENTATION
($377,551)
BC 005
Back Charge - Shanty Rental - Level 2 CTB
($76,410)
Nov-19
Jun-20
BC 008
CREDIT - Substitute Gyp in lieu of GFRG at Trusses
($29,855)
Mar-19
Jun-20
BC 009
BACK CHARGE - Temp Power for Shanty - Level 2 CTB
($5,000)
Aug-19
Jun-20
BC 011
BACK CHARGE - Re-inspect Wall at Electrical Closet - Plug Congirtm Actual
($2,000)
Oct-19
Jun-20
BC 012
BACK CHARGE - BV Re-Inspections - Plug Confirm Actual
($5,000)
Jan-20
Jun-20
BC 013
BACK CHARGE - Equipment use
($73,590)
Dec-19
Jun-20
BC 014
BACK CHARGE - SOFP Patching
($32,118)
Jun-20
BC 015
BACK CHARGE - Additional SOFP Patching
($51,396)
Jun-20
BC 017
BACK CHARGE - Panel Max Delivery too Big - Plug Confirm Actual
($5,000)
Oct-19
Jun-20
BC 018
BACK CHARGE - J Supor Storage for GFRG
($40,000)
Oct-19
Jun-20
BC 019
BACK CHARGE - Damaged Fins Radiator - Plug Confirm Actual
($5,000)
Jan-20
Jun-20
BC 020
BACK CHARGE - Damage to Moving Walk Way - Plug Confirm Actual
($5,000)
BC 021
CREDIT - Remove Reveal at East Escalator Wall - Plug Confirm Actual
($2,500)
Nov-19
Jun-20
BC 023
BACK CHARGE - Damage at Tennant Space - Plug Confirm Actual
($5,000)