Meeting #13

Description: Mockup to be coordinated after deck pour; Murat submitted Blaze Track used in HH under Spearhead header – pending HOK approval

Previous Meeting Minutes: 6/12/2019 - Meeting with Island and other subcontractors (including Spearhead) took place prior to this meeting on 6/12; Gary to install a couple angles on PBB steel slanted columns as a “mockup” for Island to review SOFP condition; Murat to send Spearhead the HH submittal for top track used in HH interior walls; SWJV to review SOFP thickness requirement at bolts but plan is to submit RFI as case- by-case basis if needed during construction 5/28/2019 - SWJV meeting with Island on 5/29/19; will set up meeting with Spearhead and Island in potentially 2 weeks; SWJV and Spearhead to look further into bolt connections with SOFP to see if RFI for general condition allowing < 2” at these locations is acceptable in case Spearhead needs to scrape some off in the tight areas UPDATE 5/29/19 per meeting with Island: hanger depth is 6" from surface; so if attached to deck 6" from deck, if to steel 6" from BOS 5/14/2019 - Setup Meeting First week of June. Need to discuss hanger depth, 6” from bottom of steel or bottom of deck. 4/29/2019 – SWJV to verify hanger depth from bottom of steel or deck. 4/9/2019 - SWJV is targeting SOFP middle of June start date. Field coordination meeting prior to starting clips. See 4/2/2019 Meeting Minutes for Previous Notes

5

Made with FlippingBook - professional solution for displaying marketing and sales documents online