REA Final - 22 Dec 20 - eBook - 1682 pages

Meeting #13

Coordination: Deliverables/Equipment/Logistics

No

Meeting Origin Title

Assignment

Due Date Priority

Status

Old/New?

4.1

1

GRFG Substitution Mockup

Sean Reed (Spearhead)

2/28/2019 High

Open

Old

Description: LGP (Sherry Maleki) replied to SWJV email for substitution – SWJV to review and confirm with Sean for highlighted drawings prior to responding

Previous Meeting Minutes: 6/12/2019 - Brian to send substitution email for LGP confirmation this week; HOK accepted the official drawing confirming each item that is gyp in lieu of GFRG per RFI 5/28/2019 - Brian to send substitution email for LGP confirmation this week; Spearhead to submit official drawing as requested by HOK confirming each item that is gyp in lieu of GFRG 5/14/2019 - SWJV to send substitution confirmation from LGP. 4/29/2019 – Informal approval from LGP. SWJV to get confirmation. 4/9/2019 - Reviewed with LGP. Spearhead to submit follow up RFI regarding control joints between GRG and GFRC. 4/2/2019 – Mockup complete, Reviewing with LGP 4/9/2019 See 4/2/2019 Meeting Minutes for Previous Notes

4.2

1

Radiator Enclosure Mockup

Doug Moore (SWJV)

3/15/2019 High

Open

Old

Description: Celtic to have mockup for Thursday, 7/11/19

Previous Meeting Minutes: 6/12/2019 - Celtic confirmed Thursday, 6/20 5/28/2019 - Celtic to advise date 5/21/2019 – Met with Doug from SWJV to discuss details, reference Coordination Matrix. Forthcoming info coming from Celtic. 5/14/2019 - Meeting scheduled with Celtic to work out details 4/29/2019 – Setting up meeting for week of 5/13/2019 4/9/2019 - Preliminary Shop Drawings received from Celtic. SWJV will send to Spearhead for review/comment. 4/2/2019 – Celtic producing preliminary drawings for review and comment by SWJV See 4/2/2019 Meeting Minutes for Previous Notes

4.3

1

Site Requirements - Conex

SWJV

3/5/2019 Medium Open

Old

Description: CLOSED

Previous Meeting Minutes: 5/28/2019 - current Spearhead conex box will not be moving, no additional charges if not hooking up; SWJV provided cost for hookup if Spearhead looking to get another box with electricity; if more conex boxes become available, SWJV to notify Spearhead 5/14/2019 - Cost meeting upcoming, will request information on hookup costs . 4/29/2019 – SWJV to check on revised costs for hookups. 4/9/2019 - Re-Opened. Spearhead to look into using second box which could potential receive power. SWJV to send hookup cost. 4/2/2019 - CLOSED . See 4/2/2019 Meeting Minutes for Previous Notes

4.4

2

Deliveries

SWJV/Spearhead

Ongoing Low

Open

Old

Description: Sean Reed and Gary can review DMS with Mack and Sean Hickey if needed

Previous Meeting Minutes: 6/12/2019 - Demo team to reschedule DMS training for Sean Reed. 5/28/2019 - Sean Reed participating in DMS training for Demo team

4/2/2019 – Discussed site logistics for deliveries See 4/2/2019 Meeting Minutes for Previous Notes

4.7

3

Fireproofing Coordination

Gary Miuccio (Spearhead)

3/22/2019 Low

Open

Old

4

Made with FlippingBook - professional solution for displaying marketing and sales documents online