Division 01 - DDC STANDARD GENERAL CONDITION SINGLE CONTRACT PROJECTS Issue Date June 01, 2013 Revised - January 15, 2015
-3. .. _"'",'.,.,.,..".'. DESIGN + CONSTRUCTION
stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
1.8 QUALITY ASSURANCE: A.
The Contractor shall designate a Waste Management Coordinator, to ensure compliance with this section. Coordinator shall be present at Project site full time for the duration of the project. B. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program. C. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction. D. Waste management plans, documentation and implementation shall be discussed at the following meetings: 1. Pre-demolition kick-off meeting 2. Pre-construction kick-off meeting 3. Regular job-site meetings 4. Contractor toolbox meetings
PART II - PRODUCTS (Not Used)
PART Ill- EXECUTION
3.1 WASTE PLAN IMPLEMENTATION: A.
The Contractor shall implement the Waste Management Plan, coordinate the Plan with all affected trades, and designate one individual as the Construction Waste Management Representative, who will be responsible for communicating the progress of the Plan with the Commissioner on a regular basis, and for assembling the required LEED documentation. B. The Contractor shall be responsible for the provision of containers and the removal of all waste, non- returned surplus materials, and rubbish from the site in accordance with the approved Waste Management Plan. The Contractor shall oversee and document the results of the Plan. Monies received for salvaged materials shall remain with the Contractor, except the monies for those items specifically identified elsewhere in the specifications, or indicated on the drawings as belonging to others. C. Responsibilities of Subcontractors: Each subcontractor shall be responsible for collecting its waste, non- returned surplus materials, and rubbish, in accordance with the Waste Management Plan. D. Distribution. The Contractor shall distribute copies of the Waste Management Plan to each Subcontractor, Resident Engineer, Construction Manager, and Commissioner. E. Instruction: The Contractor shall provide on-site instruction of proper waste management procedures to be used by all parties in appropriate stages of the Project. F. Procedures. Conduct waste management operations to ensure minimum interference with site vegetation, roads, streets, walks and other adjacent occupied and used facilities. 1. Collect co-mingled waste and/or separate all recyclable waste in accordance with the Plan Specific areas on the Project site are to be designated, and appropriate containers and bins clearly marked with acceptable and unacceptable materials. 2. Inspect containers and bins for contamination and remove contaminated materials if found.
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-5