Division01 - DOC STANDARD GENERAL CONDITION SINGLE CONTRACT PROJECTS Issue Date J.une01, 2013 Revised - January 15, 2015
~ ... -,..,, ........ ,., DESIGN + CONSTRUCTION
3. Comply with the General Conditions for controlling dust and dirt, environmental protection, and noise control.
3.2 ADDITIONAL DEMOLITION AND SALVAGE REQUIREMENTS: A.
Demolition and salvage of additional items indicated in other sections of the Project Specifications require special attention as part of the overall 75 % diversion from landfill. Specific requirements for special attention are designated in other sections of the Project Specifications.
3.3 DISPOSAL: A.
General. Except for items or material to be salvaged, recycled or otherwise reused, remove waste material from the Project site and legally dispose of them in a manner acceptable to authorities having jurisdiction. 1. Except as otherwise specified, do not allow waste materials that are to be disposed of to accumulate on site. 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. B. Burning. Do not burn waste materials C. Disposal. Transport waste materials off Project Site and legally dispose of them.
END OF SECTION 01 7419
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-6