REA Final - 22 Dec 20 - eBook - 1682 pages

LaGuardia Airport Pedestrian Bridge B

Meeting Agenda Tuesday, November 27 th , 2018 @10:00am

GFRG/GFRC Design Coordination (Spearhead/Plasterform/SWJV/HOK)

Skanska-Walsh

Quality:

-

Pre-Installation Meeting (QC)

- Mock-ups to demonstrate aesthetics and set quality standards for fabrication and installation.

-

Shop Visits

Scope of Work:

-

Furnish and Install GFRG and GFRC

- Attachment to Structure (cold formed framing/clips/angles/shims/etc…)

-

Ceiling Suspension Systems

Submittals:

- Shop Drawings: one complete package or submit as received

- Samples: are new samples required or can we submit what was used at CCB

Schedule:

- Place attachments prior to Spray On Fireproofing in March 2019

- Installation of GFRG/GFRC enclosures to begin April 2019

Coordination:

- Different Groupings of Geometry based on Sloping Floor and Ceiling

-

Shell Thickness 3/8” or 3/16”

- Optimizing Molds / Minimizing molds required

o Are there locations that Gyp Board could be used in lieu of GFRG

o Can the location of the seam be moved to reduce number of custom pieces that require a

taper (ex: 4/A85-70-00-00-00).

Page 1 of 2

R:\PEDSTRIAN BRIDGE B\PBB - Employee Mailbox\Brian Mock\02. Interior Framing - Spearhead\Coordination Meeting\GFRG Coordination

Meeting Agenda 2018_11_26.doc

Last printed 11/26/2018 11:02:00 AM

Made with FlippingBook - professional solution for displaying marketing and sales documents online