REA Final - 22 Dec 20 - eBook - 1682 pages
DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF
EXHIBIT “C” Attachment to Agreement No. 1213126J-000.620027 dated July 16, 2018, by and between Spearhead Construction LLC. and Skanska/Walsh JV for Furnish and Install Building Framing & Partitions for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York.
SUBTOTAL
$783,532
Cost of Planned Work
Scope
Qty.
UM
Total
Item
Lump-sum amount:
=
$1,088,536
ALLOWANCES
Qty. UM Unit Pricing
Total
Item
1 Access Doors
1 LS
$10,000
PART 2 - ALTERNATES: Pricing response to the following Alternates will be stated as adds/ deducts in Exhibit C. Subcontractor’s cost is understood to express all items required to incorporate the Alternate Add/ Deduct from the Subcontractor’s base Price for work required, including General Conditions, Overhead & Profit, and other cost impacts to integrate the alternate scope change into the Subcontractor’s Scope of Work. 1. Alternate No. 01: ADD for Workers’ Compensation & Employer’s Liability Insurance costs on site performed direct work if the Wrap Up Insurance Program (CCIP) described in Exhibit G is NOT instituted on the project. Add $N/A 2. Alternate No. 02: ADD Furnish, Install, and Remove Temporary Wall at Concourse B Level 3 approximately 15’ North of BT.3 Line and approximately 85’ Long by 40’ high/ Add $51,646 A. Significant Work categories to be sourced through 2 nd -tier Subcontractors or Suppliers. B. Name firms if source is known, or confirm selection through future Bid process. 2. Work sourced through M/WBE classified Subcontractors or Suppliers to meet the M/WBE goals. A. State Work categories and anticipated Price range of each. B. Confirm anticipated M/WBE percentage (%) range of overall GMP to be M/WBE. C. Name firms if source is known, or confirm selection through Bid process. 3. If multiple firms are being considered for same work at time of proposal, Subcontractor shall state list firms considered. Final assignment and selection will be made before Construction Services Subcontract is PART 3 – – 2 nd Tier SUBCONTRACTORS and SUPPLIERS 1. Subcontractor shall provide information on:
Exhibit C, Page 4 of 12
Alternates, Unit Prices, and Labor Rates
Version 4.0
(05.2009 ed. Rev. 1)