REA Final - 22 Dec 20 - eBook - 1682 pages
cover was set to be replaced with the stainless cover at the time of this incident, which caused no damage to the Moving Walkway or time or cost to the project. BC 021 – Remove Reveal at East Escalator Wall - Plug Confirm Actual ($2,500) No Credit See: BC – 21 PBB East Escalator Wall.pdf SWJV directed Spearhead to remove Reveal at East Escalator wall and replace with 14 ga metal blocking . Both parties agreed the swap was a “push.” BC 023 – Damage at Tennant Space - Plug Confirm Actual ($5,000) No Credit See : BC - 23 Damage Not Caused By Spearhead in BK diner.pdf Spearhead did not cau se damage to Holt’s millwork at the Brooklyn Diner nor did Holt accuse Spearhead of causing damage. The initial accusation and subsequent Back Charge remain an astonishing distortion of the facts. Additionally, SWJV has yet to provide requested evidence that Holt contracting identified Spearhead as the contractor who caused previous damage to Millwork. SWJV has not provided an invoice and paid receipt for repair of damage because it does not exist. BC – 024 Punchlist Cost to Perform Open Items ($14,231) No Credit See: BC – 24 Concourse_B_Bridge-punch_list.pdf BC - 24 Concourse_B_Bridge- punch_list_Spearhead.pdf Spearhead performed all Punch List items and did not leave the job site until there were no outstanding it ems for completion. Absent from SWJV’s documentation are photos of other contractors allegedly performing Spearhead’s work. SWJV did not provide requested daily reports indicating items repaired, craft, number of workers and durations of work. Instead, the SWJV supporting document for this Back Charge ( BC - 024 Concourse_B_Bridgepunch_list_Spearhead) indicates the document was printed on July 7, 2020 and contains only one Spearhead item (#175) annotated as, “Work Required.” The attached ( Concourse_B_Bridge-punch_list.pdf) is a record of Spearhead contemporaneous notes/status of items. Spearhead’s working document was printed on April 11, 2020 . On page 16, item #175 is annotated as, “Resolved.” Spearhead is not responsible for damage caused by others after its work had previously been approved or annotated as resolved. BC – 026 Elevator Operator Time - Shaft Wall ($13,395) No Credit See: BC – 26 PBB Elevator Operator Distribution_shaft wall.pdf
Made with FlippingBook - professional solution for displaying marketing and sales documents online