REA Final - 22 Dec 20 - eBook - 1682 pages
Meeting #12
Change Management
No Meeting Origin Title
Assignment
Due Date Priority Status Old/New?
6.2
1
Level 1-3 and Feature Wall Pricing
Sean Reed (Spearhead)
3/15/2019 High Open Old
Description: Spearhead awarded BOH space – Andee and Frank met to discuss; Spearhead to provide breakout schedule for BOH; work on submittals; ZT went behind temp CB wall on Wed night – to provide information to Spearhead
Previous Meeting Minutes: 5/28/2019 - SWJV finalizing BOH leveling sheet to submit award recommendation of Spearhead to cost department; Brian to speak with Andee; Spearhead to release Plasterform on shop drawings for GFRG to release piece ASAP; will need to update gyp schedule 5/14/2019 - Reviewed pricing with Gene Rega. Spearhead to provide final pricing week of 5/20/2019. 4/29/2019 – SWJV to setup meeting with Spearhead to discuss pricing again. Credit for GFRG received by SWJV 4/9/2019 - SWJV received pricing from Spearhead. Based on comments Spearhead made revisions to GCs and labor rates. SWJV will review revised pricing and set up meeting to discuss pricing further.
4/2/2019 – Preliminary pricing to be sent this week See 4/2/2019 Meeting Minutes for Previous Notes
6.3 10
Thinner Capital Molds for Bolt Clash
Sean Reed (Spearhead)
5/24/2019 High Open New
Description: COR submitted; SWJV reviewing; Spearhead to confirm if there is an issue per Brian’s email with 7/8” thickness difference; SWJV to confirm how many locations this is present at
Previous Meeting Minutes: 5/28/2019 - Sean Reed to submit COR 5/14/2019 - Spearhead to provide COR with backup for Plasterform’s need to create thinner capital molds due to the SWJV steel bolting issue. This can help close SWJV deficiency #17.
8
Made with FlippingBook - professional solution for displaying marketing and sales documents online