Flushing Library Contract eBook
-1--ยท--~ Division 01 - DOC STANDARD GENERAL CONDITIONS SINGLE CONTRACT PROJECTS Issue Date June 01, 2013 Revised - January 15, 2015 DESIGN + CONSTRUCTION Contractor will be returned without review. Re-submission of the same drawings or product data shall bear the original number of the prior submission and the original titles. 2. Transmittal Form: Provide locations on form for the following information: a. Project name, DOC Project number and Contract Number b. Date c. Destination (To:) d. Source (From:) e. Names of Contractor, subcontractor, manufacturer, and supplier f. Category and type of submittal g. Submittal purpose and description h. Specification Section number and title i. Drawing number and detail references, as appropriate j. Transmittal number, numbered consecutively k. Submittal and transmittal distribution record I. Remarks m. Signature of transmitter Shop Drawings: 1. Procedures for Preparing, Forwarding, Checking and Returning all Shop Drawings shall be, generally, as follows: a. The Contractor shall make available to its subcontractors the necessary Contract Documents and shall instruct such subcontractor to determine dimensions and conditions in the field, particularly with reference to coordination between the trade subcontractors. The Contractor shall direct its subcontractors to prepare Shop Drawings for submission to the Design Consultant in accordance with the requirements of these General Conditions. The Contractor shall also direct its subcontractors to "Ring Up" corrections made on all re-submissions for approval, so as to be readily seen, and that the symbol "sub" be used to identify the source of the correction or information that has been added. The Contractor shall: 1. Review and be responsible to the Commissioner, for information shown on its subcontractor's Shop and Installation drawings and manufacturers' data, and also for conformity to Contract Documents. 2. "Ring Up" corrections made on all submissions for approval, so as to be readily seen, and that the symbol "GC", "PL", "HVAC" or "EL" be used to indicate that the correction and/or information added was made by the Contractor and/or its subcontractor(s). 3. Clearly designate which entity is to perform the work when the term, "work by others" or other similar phrases are indicated on the Contract Drawings before submission to the Design Consultant. 4. Stamp submissions "Recommended for Acceptance", date and forward to the Design Consultant. 2. The Contractor shall promptly prepare and submit project specific layout detail and Shop Drawings of such parts of the work as are indicated in the Specifications, Schedule F of the Addendum or as required. These Shop Drawings shall be made in accordance with the Contract Drawings, Specifications and Supplementary Drawings, if any. The Shop Drawings shall be accurate and distinct and give all the dimensions required for the fabrication, erection and installation of the work. 3. Size of Drawings: The Shop Drawings, unless otherwise directed, shall be on sheets of the same size as the Contract Drawings, drawn accurately and of sufficient scale to be legible, with a one half (1/2) inch marginal space on each side and a two (2) inch marginal space for binding on the left side.
F.
SUBMITTAL PROCEDURES 01 33 00 - 4
Made with FlippingBook PDF to HTML5