Division 01 - DDC STANDARD GENERAL CONDITIONS SINGLE CONTRACT PROJECTS Issue Date - June 01, 2013 Revised - January 15, 2015
-3,.,. - ,,",,",""""" ~ DESIGN + CONSTRUCTION
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION
PART I - GENERAL
1.1 RELATED DOCUMENTS: A.
The following documents apply to all required work for the Project: (1) the Contract Drawings, (2) the • Specifications, (3) the General Conditions, (4) the Addendum, and (5) the Contract [City of New York Standard Construction Contract]. B. LEED: Refer to the Addendum to identify whether this project is designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design {LEED) Rating System, as specified in Section 01 81 13, "SUSTAINABLE DESIGN REQUIREMENTS FOR LEED BUILDINGS." C. COMMISSIONING: Refer to the Addendum to identify whether this project will be commissioned by an independent third party under separate contract with the City of New York. Commissioning shall be in accordance with ASHRAE and USGBC LEED-NC procedures, as described in Section 01 91 13, GENERAL COMMISSIONING REQUIREMENTS. The Contractor shall cooperate with the commissioning agent and provide whatever assistance is required. 1.2 SUMMARY: A. This Section includes administrative provisions for coordinating construction operations on the Project including without limitation the following. 1. Coordination Drawings. 2. Administrative and supervisory personnel. 3. Project meetings. 4. Requests for Interpretation (RFls). B. This section includes the following: 1. Definitions 2. Coordination 3. Submittals 4. Administrative and Supervisory Personnel 5. Project Meetings 6. Requests for Interpretation (RFl's) 7. Correspondence 8. Contractor's Daily Reports 9. Alternate and Substitute Equipment
C. RELATED SECTIONS: include without limitation the following: 1. Section 01 10 00 SUMMARY
CONSTRUCTION PROGRESS DOCUMENTATION SUBMITTALS SAFETY REQUIREMENTS EXECUTION REQUIREMENTS CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
2. Section 01 32 00 3. Section 01 33 00 4. Section 01 35 26 5. Section 01 73 00 6. Section 01 74 19
PROJECT MANAGEMENT AND COORDINATION 01 31 00 -1