Division 01 - DDC STANDARDGENERAL CONDITIONS SINGLE CONTRACT PROJECTS Issue Date - June 01, 2013 Revised - January 15, 2015
~mOK DESIGN + CONSTRUCTION F. Observe and inspect construction. Report progress and deficiencies to the Commissioner. In addition to compliance with the OPR, BoD, and Contract Documents, inspect systems and equipment installation for adequate accessibility required for component maintenance replacement and repair. G. Prepare Project-specifictest and inspection procedures and checklists. H. Coordinate with the Resident Engineer to schedule, direct, witness, and document tests, inspections, and systems startup. I. Compile test data, inspection reports, and certificates and include them in the systems manual and commissioning report. J. Certify date of acceptance and startup for each item of equipment for start of warranty periods. K. Review and comment on operation and maintenance documentation and systems manual outline for compliance with the OPR, BoD, and Contract Documents. Operation and maintenance documentation requirements are specified in other sections of the project specifications and described in Section 01 78 39, CONTRACT RECORD DOCUMENTS. L. Record and edit demonstration and orientation sessions on DVD. M. Prepare commissioning reports. N. Assemble the final commissioning documentation, including the commissioning report and Systems Manual. 1.9 COMMISSIONINGDOCUMENTATION: The Contractor shall assist the CommissioningAgent (CxA) in the development and compiling of the following CommissioningDocumentation: A. Index of Commissioning Documents: The CommissioningAgent (CxA) will prepare an index including the storage location of each document. B. OPR: A written document prepared by the Commissioning Agent (CxA) that details the functional requirements of the Project and expectations of how it will be used and operated. This document includes the Project and design goals, measurable performance criteria, budgets, schedules, success criteria, and supporting information. C. BoD Document: A document prepared by the Consulting Architect/Engineer that records concepts, calculations, decisions, and product selections used to meet the OPR and to satisfy applicable regulatory requirements, standards, and guidelines. The document includes both narrative descriptions and lists of individual items that explain the designed systems. D. Commissioning Plan: A document prepared by the Commissioning Agent (CxA) that outlines the schedule, allocation of resources, and documentation requirements of the commissioning process. E. Test Checklists: The Commissioning Agent (CxA) will develop test checklists for each system, subsystem, or equipment including interfaces and interlocks, and include a separate entry, with space for comments, for each item to be tested. The CxA will prepare separate checklists for each mode of operation and provide space to indicate whether the mode under test responded as required. Space will be provided for testing personnel to sign off on each checklist. Specific checklist content requirements are specified in other sections of the project specifications. F. Inspection Checklists will be signed by the Contractor, Subcontractor(s), lnstaller(s), and CxA certifying that systems, subsystems, equipment, and associated controls are ready for testing. G. Test and Inspection Reports: The Commissioning Agent (CxA) will record test data, observations, and measurements on test checklists. Photographs, forms, and other means appropriate for the application will be included with data. CxA shall compile test and inspection reports and test and inspection certificates and include them in systems manual and commissioning report. GENERAL COMMISSIONINGREQUIREMENTS 019113-4
Made with FlippingBook PDF to HTML5