SECTION 01 9113 GENERAL COMMISSIONING REQUIREMENTS

REFER TO THE ADDENDUM FOR APPLICABILITY OF THIS SECTION 01 91 13

PART I - GENERAL

1.1 RELATED DOCUMENTS: A.

The following documents apply to all required work for the Project: (1) the Contract Drawings, (2) the Specifications, (3) the General Conditions, (4) the Addendum, and (5) the Contract [City of New York Standard Construction Contract]. B. OPR and BoD documentation are included by reference for information only. C. The Commissioning Plan, prepared by the Commissioning Agent (CxA) under separate contract with the City of New York, contains requirements that apply to this section. This Section includes general requirements that apply to implementation of Commissioning without regard to systems, subsystems, and equipment being commissioned. 8. This Section includes: 1. Definitions 2. Commissioning Team 3. City's Responsibilities 4. Each Contractor's Responsibilities 5. Commissioning Authority's/Agent's (CxA) Responsibilities 6. Commissioning Documentation 7. Submittals 8. Coordination 1.3 RELATED SECTIONS: Include without limitation the following: A. "HVAC Commissioning Requirements" indicated in other sections of the project specifications for specific requirements for commissioning HVAC systems. B. This project will be commissioned by an independent third party under separate contract with the City of New York. Commissioning shall be in accordance with ASHRAE and USGBC LEED procedures, and specific commissioning requirements of the Project Specifications, whichever is more stringent. The Contractor shall cooperate with the CxA and provide whatever assistance is required. C. Related Sections include without limitation the following: 1. Section 01 10 00 SUMMARY 2. Section 01 31 00 PROJECT MANAGEMENT AND COORDINATION 3. Section 013200 CONSTRUCTION PROGRESS DOCUMENTATION 4. Section 01 78 39 CONTRACT RECORD DOCUMENTS 5. Section 017900 DEMONSTRATION AND OWNERS PRE-ACCEPTANCE ORIENTATION 6. Section 01 8113 SUSTAINABLE DESIGN REQUIREMENTS FOR LEED BUILDINGS 1.4 DEFINITIONS: 1.2 SUMMARY: A.

A. Refer to Article 2 of the Contract for definition of terms, words and expressions used in the General Conditions not otherwise defined herein.

GENERAL COMMISSIONING REQUIREMENTS 019113-1

Made with FlippingBook PDF to HTML5