2.1 CONTRACT RECORD DRAWINGS: A.

Record Prints: The Contractor shall maintain one set of blue- or black-line white prints as applicable of the Contract Drawings and Shop Drawings. If applicable, the Record Contract Drawings and Shop Drawings shall incorporate the arrangement of the work based on the accepted Master Coordination Drawing(s) as described in Section 01 33 00, SUBMITTAL PROCEDURES. 1. Preparation: The Contractor shall mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints. a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later. b. Accurately record information in an understandable drawing technique. c. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations. 2. Change Orders: All changes from Contract Drawings shall be distinctly encircled and identified by Change Order number correlating to changes listed on the "Title Sheet." The Contractor shall show within the encircled areas the work as actually installed. B. Content: Types of items requiring marking include, but are not limited to, the following: 1. Dimensional changes to Drawings. 2. Revisions to details shown on Drawings. 3. Depths of foundations below first floor. 4. Locations ar,iddepths of underground utilities. 5. Revisions to routing of piping and conduits. 6. Revisions to electrical circuitry. 7. Actual equipment locations. 8. Duct size and routing. 9. Locations of concealed internal utilities. 10. Changes made by Change Order 11. Changes made following Commissioner's written orders. 12. Details not on the original Contract Drawings. 13. Field records for variable and concealed conditions. 14. Record information on the Work that is shown only schematically. C. Progress Record Mylar's (reproducible): As directed by the Resident Engineer at 50% construction completion, review marked-up Record Prints with the Resident Engineer and the Design Consulting. When directed by the Resident Engineer transfer progress mark-ups to a full set of Mylar's (reproducible) and submit one blue line or black line record copy to the Resident Engineer. The marked-up Mylar's (reproducible) shall be retained by the contractor for completion of mark-up and final submission. D. Final Contract Record Mylar's (reproducible): Immediately before final inspection for Certificate of Substantial Completion, review marked-up Record Prints with the Resident Engineer and the Design Consulting. When authorized, complete mark-up of a full set of corrected Mylar's (reproducible) of the Contract Drawings. 1. Incorporate changes and additional information previously marked on Record Prints. Erase, redraw, and add details and notations where applicable. 2. Refer instances of uncertainty to Resident Engineer for resolution. 3. Print the As-Built Contract Drawings and Shop Drawings for use as Record Transparencies as described in Sub-Section 1.5.

CONTRACT RECORD DOCUMENTS 01 78 39- 4

Made with FlippingBook PDF to HTML5