A. The following documents apply to all required work for the Project: (1) the Contract Drawings, (2) the Specifications, (3) the General Conditions, (4) the Addendum, and (5) the Contract [City of New York Standard Construction Contract].
1.2 SUMMARY:
A. This Section includes general procedural requirements governing execution of the Work including without
limitation the following: 1. Delivery of Materials 2. Contractor's Superintendent 3. Surveys 4. Borings 5. Examination 6. Environmental Assessment 7. Preparation 8. Deferred Construction 9. Installation 10. Permits 11. Transportation 12. Sleeves and Hangers 13. Sleeve and Hanger Drawings
14. Cutting and Patching 15. Location of Partitions 16. Furniture and Equipment 17. Removal of Rubbish and Surplus Material 18. Cleaning 19. Security And Protection of Work Site 20. Maintenance of Site and Adjoining Property 21. Maintenance of Project Site 22. Safety Precautions for Control Circuits 23. Obstructions in Drainage Lines
1.3 RELATED SECTIONS: Include without limitation the following:
SUMMARY PROJECT MANAGEMENT AND COORDINATION SUBMITTAL PROCEDURES CONSTRUCTION WASTE MANAGEMENT & DISPOSAL CLOSEOUT PROCEDURES CONTRACT RECORD DOCUMENTS
Section 01 10 00 Section 01 31 00 Section 01 33 00 Section 01 74 19 Section 01 77 00 Section 01 78 39
A. B. C. D. E. F.
EXECUTION 01 73 00 - 1