Division 01 - DOC STANDARDGENERAL CONDITION SINGLE CONTRACT PROJECTS Issue Date June 01, 2013 Revised - January 15, 2015

-3..,W,OOK

DESIGN + CONSTRUCTION

G. ADVERTISING PRIVILEGES - The City reserves the right to all advertising privileges. The Contractor shall not cause any signs of any kind to be displayed at the site unless specifically required herein or authorized by the Commissioner.

3.8 DOC FIELD OFFICE:

REFER TO THE ADDENDUM FOR THE APPLICABILITY OF SUB-SECTION 3.8 A

A.

OFFICE SPACE IN EXISTING BUILDING: 1.

The Resident Engineer will arrange for office space for sole use in the building where work is in progress. The Contractor shall provide and install a lockset for the door to secure the equipment in the room. The Contractor shall provide two (2) keys to the Resident Engineer. After completion of the project the Contractor shall replace the original lockset on the door and ensure its proper operation. 2. In addition to equipment specified in Sub-Section 3.8 D, the Contractor shall provide, for exclusive use of the DOC Field Office, the following: a. Two (2) single pedestal desks, 42" x 32"; two (2) swivel chairs with arms and three (3) side chairs without arms to match desk. Two metal (2) lockers, single units, 15" x 18" x 78" overall including 6" legs. Lockers to have flat key locks with two (2) keys each, General Steel products or approved equal. Two (2) full ball bearing suspension four (4) drawer vertical legal filing cabinets with locks, approximately 52"H x 28 ½"D x 18"W. b. One (1) 9000 B.T.U air conditioner or as directed by Commissioner. Wiring for the air conditioner shall be minimum No. 12AWG fed from individual circuits in the fuse box. c. One (1) folding conference table, 96" x 30" and ten (10) folding chairs. d. Two (2) metal wastebaskets. e. One (1) fire extinguisher, one (1) quart vaporizing liquid type, brass, wall mounted by Pyrene No. C21 or approved equal. f. One (1) Crystal Springs water cooler with bottled water, Model No. LP14058 or approved equal to be furnished for the duration of the project as required. 3. The Contractor shall provide one (1) telephone, where directed and shall pay all costs for telephone service for calls within the New York City limits for the duration of the project. 4. All furniture and equipment, except computer equipment specified in Sub-Section 3.8 D.3, shall remain the property of the Contractor. 5. Computer Workstation quantities shall be provided as specified in Sub-Section 3.8 B 3-a for DOCManaged Projects, or Sub-Section 3.8 B 3-b for CM Managed Projects. GENERAL: The Contractor shall, for the time frame specified herein, provide and maintain at its own cost and expense a DOC Construction Field Office and all related items as specified herein [hereinafter collectively referred to as the "DOC Field Office"] for the exclusive use of the Resident Engineer. The DOC Field Office shall be located at the Project site and shall be solely dedicated to the Project. Provision of the DOC Field Office shall commence within THIRTY (30) days from Notice to proceed and shall continue through forty-five (45) days after Substantial Completion of the required construction at the Project site. The Contractor shall remove the DOC Field Office forty-five (45) days after Substantial Completion of the required construction, or as otherwise directed in writing by the Commissioner. 2. TRAILER: The Contractor shall provide at its own cost and expense a mobile office trailer for use as the DOC Field Office. The Contractor shall install and connect all utility services to the REFER TO THE ADDENDUM FOR THE APPLICABILITY OF SUB-SECTION 3.8 B DOC FIELDOFFICE TRAILER: 1.

B.

TEMPORARY FACILITIES, SERVICESAND CONTROLS 01 50 00 -14