REA Final - 22 Dec 20 - eBook - 1682 pages
From: Sean
* This email originated from outside of Armstrong World Industries. I didn't see you on this one either. Can you please produce a letter that indicates that we are already in line for fabrication? Thanks, Sean Reed Project Manager Spearhead Construction, LLC MBE | WBE | SDVOB | SDVOSB | PANYNJ | NYCSBS Sean @ SpearheadCx.com Ph: 631.793.7422 The information contained in this email message is legally privileged and confidential information intended solely for the use of the intended recipient(s). If you are not the intended recipient(s), any distribution, dissemination, or reproduction of this email message is strictly prohibited. If you have received this message in error, please immediately reply to the sender and then destroy this message. From: Trause, Zachary
Subject: RE: Pedestrian Bridge B - GFRC and GFRG Release for Fabrication Andee – Please see attached formal release letters for your records. Thank you. Zack Trause Project Engineer
SKANSKA WALSH Design-Build Joint Venture LaGuardia Airport CTB Replacement Project Hangar 5A Runway Drive Flushing, NY 11371 Mobile: (917) 565-6140 Think twice before you press "print."
This message, including any attachments hereto, may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s). If you are not an intended addressee, you may neither use this message nor copy nor deliver it to anyone. In such case, you should immediately destroy this message and kindly notify the sender by reply email. Thank you. From: Mock, Brian
Made with FlippingBook - professional solution for displaying marketing and sales documents online