REA Final - 22 Dec 20 - eBook - 1682 pages
Spearhead Impact of Steel Major source of Increased Costs – Continuous Field Modifications / Re-work
Steel Out of Plumb
Continuous re-work caused by out of plumb steel
Image Left: Access Lines 1. Access lines not centered on trusses 2. Variance of access line to center line of truss as large as 2” 3. Truss framing required re- work to “straighten” trusses to accept GFRG/C Image Right: Clips and Studs 1. Clips had to be extended on one side and cut on opposite side 2. Studs were “ripped” down / shaved off to taper into truss in order to provide squared surface to attach GFRG/C
CENTER LINE
ACCESS LINE
Note: Removal of excessive Fireproofing also added time
Made with FlippingBook - professional solution for displaying marketing and sales documents online