Spearhead Loss of Productivity
Cause and Effect
Spearhead Lost Productivity
DELAYED START
NO SCHEDULE
OVERTIME
2x MANPOWER
GFRG “NO GUARANTEE”
DELIVERY DELAYS
2 nd SHIFT
UNSCHEDULED WORK STOPPAGE
INSPECTION DELAYS
WEEKENDS
HOLIDAYS
ABANDONDED “HEAT MAP”
OUT OF SEQUENCE WORK
DAMAGE TO WORK
LOST TIME
INCONSISTENT SLOPE
FLOOR DECK DROPPED
POOR ACCESS
ROOF PITCHED
BOLTS INSTALLED BACKWARDS
LACK OF ACCESS TO WORK AREAS
TRUSSES OUT OF PLUMB
ACCESS
STEEL “FOUND CONDITIONS”
What Spearhead built is completely different than what Spearhead contracted for.