Our suggestion is to discuss specifically with Spearhead and SWJV what the schedule is and how we need to meet this.  I'm available for the rest of the day.   Thanks, Sean Reed Project Manager Spearhead Construction, LLC MBE | WBE | SDVOB | SDVOSB | PANYNJ | NYCSBS Sean @ SpearheadCx.com Ph: 631.793.7422

The information contained in this email message is legally privileged and confidential information intended solely for the use of the intended recipient(s). If you are not the intended recipient(s), any distribution, dissemination, or reproduction of this email message is strictly prohibited. If you have received this message in error, please immediately reply to the sender and then destroy this message.

From: Mock, Brian Sent: Wednesday, January 23, 2019 11:08 AM To: Andee Cc: Sean; Mario J. Botelho; Xian (Shane) Hu; Corallo, Frank; Dolan, John; Piscopo, Vincent; Scandariato, Frank Subject: Pedestrian Bridge B GFRG/GFRC Fabrication & Delivery Schedule Andee, Now that we have received the Plasterform shop drawings that have specified the number of pieces and molds required for Pedestrian Bridge B, we need to address the fabrication and delivery schedule as it relates to the GFRG/GFRC scope of work. As previously discussed, we need to begin receiving deliveries May 1 st , 2019 with final delivery by end of August, 2019. Based on this duration, please provide a fabrication sequence/schedule for review in order to meet the schedule. If you have any questions, please do not hesitate to contact Frank Corallo or myself. Thank you, Brian P. Mock Assistant Project Manager

SKANSKA WALSH Design-Build Joint Venture LaGuardia Airport CTB Replacement Project Hangar 5A Runway Drive  Flushing, NY 11371

Mobile: (646) 891-9296 Direct: (718) 310-4615