This is a notification sent from an unmonitored email address. There is 1 new observation

1 of 1: Observation #17: TAA-GR 3147.07 HOK Observation Report S005 item 1- Bolts at vertical gussets installed with nut on the outerface, roof level Created By: Dany Chehade on 02/05/19 Number: 17 Type: Non-Conformance Title:

TAA-GR 3147.07 HOK Observation Report S005 item 1- Bolts at vertical gussets installed with nut on the outerface, roof level

Structural

Trade:

Chung Tia (Skanska Walsh JV)

Assignee:

02/12/19

Due Date:

Initiated

Status:

High

Priority:

PBB - Area BG

Location:

Rafik Moawad (Skanska Walsh JV) Victor Torres (Skanska Walsh JV) Peter Costanzo (HOK) Matt Batzer (Skanska Walsh JV) Justin Jennings (HOK) Eric Dovak (Skanska Walsh JV) Zachary Trause (Skanska Walsh JV) Brian P. Mock (Skanska Walsh JV) Robert Mellone (Skanska Walsh JV) Tej Savalia (Skanska Walsh JV) Samy Elsayed (Skanska Walsh JV) Frank Corallo (Skanska Walsh JV) Brady Lawler (Skanska Walsh JV) Chung Tia (Skanska Walsh JV) Michael Boland (Skanska Walsh JV) Sean Hickey (Skanska Walsh JV) Douglas Moore (Skanska Walsh JV) Francesca Meola (HOK) Enrico Tomassoli (HOK)

Distribution:

Bolts connecting the brace beams to the gusset plates of the main bridge truss were installed with the nuts being placed on the outer face of the gusset along grid BR and

Description:

Made with FlippingBook - professional solution for displaying marketing and sales documents online