BCM Additional Labor Costs Due to Covid
open light fixtures and will release all for fabrication. Issue with JC light fixture, architect revised and resubmitted JC fixture submittal to request 12”W light fixtures to fit within framing Will coordinate with Spearhead CX as GFRG panels are installed for installation of light cove fixtures – ongoing to install outlets in GFRG along South wall Installation of WAP’s in ceiling Possible door swing issue with door 104. Dimmer rack dimensions prevent full 90 o opening Will install bridle rings along steel framing for feeding lights Will run wiring behind stage wall up to ceiling area Drawing of cad files to be released for final coordination – Coordination complete for installation of theatrical lights in ceiling area Installation of ATS at auditorium closet on going What do you need from XBR or other trades?
Next meeting will be scheduled on Tuesday, February 16, 2021 at 9am . Weekly meetings required until all trades are coordinated and well underway for their scope of work. Bi‐weekly meetings thereafter.
Page 4 of 4
Made with FlippingBook. PDF to flipbook with ease