Brooklyn Children’s Museum Auditorium Fit‐Out Sub‐contractor Coordination Meeting #1

Date: 01‐19‐21 Time: 8:00AM

Members Present Carlos Quezada ‐ XBR Stephen Comer – ACS System Associates (HVAC) Billy Bruggemann – Milad Contracting Corp (Electrical) Sean Reed – Spearhead Construction (Carpentry) Ainsworth Thomas – Spearhead Construction (Carpentry) Kris Shaw – Cross Island Mechanical (Sprinkler) Safety

 COVID 19 is still present and all precautions should be taken. Please remember to follow guidelines for social distancing and wearing face coverings. If you have symptoms, every person that comes onto the site MUST sign in.  Scaffolding platform is installed, therefore, ALL workers, foremen, supers, MUST have minimum 4 hour Support Scaffold users card to work on platform level  Loading of equipment and materials is limited to only what will be needed to work on for the day  Storage of materials is NOT permitted on platform  No removal of safety guards permitted Cross Island Mechanical  Layout sprinkler heads location on floor of platform, based off reference lines to be laid out by Spearhead, on Friday  Pending RFI for clarification on sprinkler heads in 2 nd floor closet hallway, above purge ductwork

 Pending RFI for clarification of sprinkler heads installed at angle: coverage ok?  Work can begin underneath balcony and in 2 nd floor hallway (RFI 00075)

 Release coordination drawings by end of the week  DOB hydrostatic testing and inspection required What do you need from XBR or other trades?