Division 01 - DOC STANDARD GENERAL CONDITIONS SINGLE CONTRACT PROJECTS Issue Date - June 01, 2013 Revised - January 15, 2015
-1M-ONO.-~
DESIGN + CONSTRUCTION
SECTION 01 35 03 GENERAL MECHANICAL REQUIREMENTS REFER TO THE ADDENDUM FOR APPLICABILITY OF THIS SECTION 01 35 03
PARTI-
GENERAL
1.1 RELATED DOCUMENTS:
A. The following documents apply to all required work for the Project: (1) the Contract Drawings, (2) the Specifications, (3) the General Conditions, (4) the Addendum, and (5) the Contract [City of New York Standard Construction Contract].
1.2 SUMMARY:
A. The General Mechanical Requirements contained herein shall be followed by the Contractor, as well as its subcontractor for HVAC work. This Section sets forth the General Requirements applicable to mechanical work for the Project. Such requirements are intended to be read in conjunction with the Specifications and Contract Drawings for the Project. In the event of any conflict between the requirements set forth in this Section and the requirements of the Specifications and/or the Contract Drawings, whichever requirement is the most stringent, as determined by the Commissioner, shall take precedence.
1.3 RELATED SECTIONS: Include without limitation the following: A. Section 01 10 00 SUMMARY B. Section 01 33 00 SUBMITTAL PROCEDURES C. Section 01 35 06 GENERAL ELECTRICAL REQUIREMENTS D. Section 01 42 00 REFERENCES E. Section 01 77 00CLOSEOUT PROCEDURES F. Section 017839CONTRACT RECORD DOCUMENTS
1.4 DEFINITIONS:
A. CONCEALED PIPING AND DUCTS-: shall mean piping and ducts hidden from sight in masonry or other construction, in floor fill, trenches, partitions, hung ceilings, furred spaces, pipe shafts and in service tunnels not used for passage. Where piping and ducts run in areas that have hung ceilings, such piping and ducts shall be installed in the hung ceilings. For work on existing piping any insulation on such existing piping is to be tested for asbestos and abated, if found to be positive by a certified asbestos contractor. Such testing and abatement shall occur prior to the performance of any work on these pipes.
1.5 SUBMITTALS:
A. INTENT OF MECHANICAL CONTRACT DRAWINGS - Mechanical Contract Drawings are in part diagrammatic and show the general arrangement of the equipment, ducts and piping included in the Contract and the approximate size and location of the equipment. B. The Contractor shall follow these Contract Drawings in laying out the work and verify the spaces in which it will be installed. The Contractors shall submit, as directed, Mechanical Shop Drawings, roughing drawings, manufacturer's Shop Drawings, field drawings, cuts, bulletins, etc., of all materials, equipment and methods of installation shown or specified in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.
GENERAL MECHANICAL REQUIREMENTS 01 35 03 - 1