Division 01 -DOC STANDARDGENERAL CONDITIONS SINGLECONTRACT PROJECTS Issue Date June 01, 2013 Revised - January 15, 2015
-l_OIT-™arr~
DESIGN + CONSTRUCTION
REFER TO THE ADDENDUM FOR THE APPLICABILITY OF SUB-SECTION 1.7
1.7 LEED SUBMITTALS: A.
Comply with submittal requirements specified in Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL; Section 01 81 13, SUSTAINABLE DESIGN REQUIREMENTS FOR LEED BUILDINGS; Section 01 81 13.13, VOLATILE ORGANIC COMPOUND (VOC) LIMITS FOR ADHESIVES, SEALANTS, PAINTS AND COATINGS FOR LEED BUILDINGS; Section 01 81 19, INDOOR AIR QUALITY REQUIREMENTS FOR LEED BUILDINGS and Section 01 91 13, GENERAL COMMISSIONINGREQUIREMENTS. B. LEED Building submittal information shall be assembled into one package per each applicable specification section, separate from all other non-LEED submittals. Each submittal package shall have a separate transmittal and identificationas described in Sub-Section 1.5 herein. C. Number of Copies: Submit FOUR (4) copies of LEED submittals, in accordancewith procedure described in Article 1.5 herein, unless otherwise indicated. D. Material Safety Data Sheets (MSDSs) for LEED Certification: Submit information necessary to show compliancewith LEED certification requirements,which will be the limit of the Design Consultant's review for LEEDcompliance. 1. Designated LEED submittals that include non-LEED MSDS data will not be reviewed. The entire submittal will be returned for re-submission. E. Product Cut Sheets and/or Shop Drawings for LEED Certification: Provide product cut sheets and/or shop drawings with the Contractor's or sub-contractor's stamp, confirming that the submitted products are the products installed in the Project. For detailed requirements refer to Sub-Section 1.6 of Section 01 81 13 SUSTAINALE DESIGN REQUIREMENTSFOR LEED PROJECTS. . 1. Provide the quantity, length, area, volume, weight, and/or cost of each product submitted as required to satisfy LEED documentation requirements. Refer to Sub-Section 1.6 of Section 01 81 13 SUSTAINABLEDESIGN REQUIREMENTSFOR LEED PROJECTS.
1.8 ULTRALOWSULFURDIESELFUELAND BESTAVAILABLETECHNOLOGYREPORTING: A.
In accordancewith Section 01 10 00 Summary, Sub-Section 1.5 E, the Contractor shall submit reports to the Commissioner regarding the use of Ultra Low Sulfur Diesel Fuel and Best Available Technology (BAT) in Non road Vehicles. Submission of such reports shall be in accordance with the schedule, format, directions and procedures established by the Commissioner.
1.9 CONSTRUCTION PHOTOGRAPHS AND DVD RECORDINGS: A.
Submit construction progress photographs and DVD recordings in accordance with requirements of Section 013233, PHOTOGRAPHICDOCUMENTATION
1.10 AS-BUil T DOCUMENTS: A.
Submit all as-built documents in accordance with Section 01 78 39 CONTRACT RECORD DOCUMENTS.