Division 01 - DOC STANDARDGENERAL CONDITIONS SINGLE CONTRACT PROJECTS Issue Date June 01, 2013
-1---~ DESIGN + CONSTRUCTION
Revised - January 15, 2015
SECTION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
PART I - GENERAL
1.1 RELATED DOCUMENTS:
A. The following documents apply to all requiredwork for the Project: (1) the Contract Drawings, (2) the Specifications, (3) the General Conditions, (4) the Addendum, and (5) the Contract [City of New York Standard ConstructionContract].
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for establishing an effective base line schedule for the project and documenting the progress of construction during performance of the Work by developing, revising as necessary, various documents including but not limited to the following: 1. BaselineConstruction Schedule. 2. Composite Schedule for entire project 3. Recovery Composite Schedule 4. Revised and/or updated Composite Schedule 5. Submittals Schedule. 6. Daily construction reports. 7. Material location reports. 8. Field condition reports. 9. Special reports.
B. RELATEDSECTIONS: includewithout limitation the following: 1. Section 01 10 00 SUMMARY 2. Section 013222 PHOTOGRAPHICDOCUMENTATION 3. Section 013300 SUBMITTAL PROCEDURES 4. Section 01 40 00 QUALITY REQUIREMENTS
1.3 DEFINITIONS:
A. Refer to Article 2 of the Contract for definition of terms, words and expressions used in the General Conditions not otherwise defined herein.
B. Design Consultant: "Design Consultant" shall mean the entity responsible for providing design services for the Project, including without limitation, preparing the construction documents (drawings and specifications) and providing services in connection with such documents during construction. The entity serving as the "Design Consultant" may be a corporation, firm, partnership, joint venture, individual or combination thereof. Such entity may be either an employee(s) of the City or an entity engaged by the City to provide such services.