Division 01 - DOC STANDARD GENERAL CONDITIONS SINGLE CONTRACT PROJECTS
-3.... ,...ar,, ......... ,.,
Issue Date June 01, 2013 Revised - January 15, 2015
DESIGN + CONSTRUCTION
SECTION 01 77 00
ATTACHMENT 'A'
The following list is a general sample of Substantial Completion requirements, including but not limited to: 1. Prepare and submit a list to the Resident Engineer, of incomplete items, the value of incomplete construction, and reasons the work is not complete. 2. Obtain and submit any necessary releases enabling the City unrestricted use of the project and access to services and utilities. 3. Regulatory Approvals: Submit all required documentation from applicable Governing Authorities, including, but not limited to, Department of Buildings (DoB); Department of Transportation (DoT); Department of Environmental Protection (DEP); Fire Department (FDNY); etc. Documentation to include, but not limited to, the following: a. Building Permits, Applications and Sign-offs. b. Permits and Sign-off for construction fences; sidewalk bridges; scaffolds, cranes and derricks; utilities; etc. c. Certificates of Inspections and Sign-offs. d. Required Certificates and Use Permits. e. Certificate of Occupancy (C.O.), Temporary Certificate of Occupancy (T.C.O.) or Letter of Completion as applicable. 4. Submit specific warranties required by the specifications, final certifications, and similar documents. 5. Prepare and submit Record Documents as described in Section 01 78 39, CONTRACT RECORD DOCUMENTS, including but not limited to; approved documentation from Governing Authorities; as-built record drawings and specifications; product data; operation and maintenance manuals; Final Completion construction photographs; damage or settlement surveys; final property surveys; and similar final record information: The Resident Engineer will review the submission and provide appropriate comments. If comments are significant the initial submission will be returned to the Contractor for correction and re-submission incorporating the comments prior to the Final Inspection. 6. Record Waste Management Progress Report: Submit C&D Waste Management logs, with legible copies of weight tickets and receipts required in accordance with Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. 7. If applicable submit LEED Letter Template in accordance with the requirements of Section 01 81 13, SUSTAINABLE DESIGN REQUIREMENTS FOR LEED BUILDINGS. 8. Schedule applicable Demonstration and Orientation required in other Sections of the Project Specifications and as described in Section 01 79 00, DEMONSTRATION AND OWNER'S PRE- ACCEPTANCE ORIENTATION. 9. Deliver tools, spare parts, extra materials, and similar items to location designated by Resident Engineer. Label with manufacturer's name and model number where applicable. 10. Make final changeover of permanent locks and deliver keys to the Resident Engineer. Advise Commissioner of changeover in security provisions. 11. Complete startup testing of systems as applicable. 12. Submit approved test/adjust/balance records. 13. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements as directed by the Resident Engineer. 14. If applicable complete Commissioning requirements as defined in Section 01 91 13, GENERAL COMMISSIONING REQUIREMENTS. 15. Complete final cleaning requirements, including touchup painting. 16. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
CLOSEOUT PROCEDURES 01 77 00 -7
Made with FlippingBook PDF to HTML5