Division 01 - DDC STANDARD GENERAL CONDITION SINGLE CONTRACT PROJECTS Issue Date June 01, 2013 Revised - January 15, 2015
-3__=•--~ DESIGN + CONSTRUCTION
E. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration up to date of Final Acceptance.
F. During handling and installation, clean and protect construction in progress and adjoining materials already .in place. Apply protective covering where required to ensure protection from damage or deterioration up to date of Final Acceptance. 3.19 SECURITY AND PROTECTION OF WORK SITE: A. Provide protection of installed work, including appropriate protective coverings and maintain conditions that ensure installed Work is without damage or deterioration up to date of Final Acceptance. B. Comply with manufacturer's written instructions for temperature and relative humidity. C. Secure and protect work and work site against damage, loss, injury, theft and/or vandalism. D. Maintain daily sign-in sheets of workers and visitors and make the sheets available to the Commissioner 3.20 MAINTENANCE OF SITE AND ADJOINING PROPERTY: A. The Contractor shall take over and maintain the Project site, after order to start work. B. The Contractor shall be responsible for the safety of the adjoining property, including sidewalks, paving, fences, sewers, water, gas, electric and other mains, pipes and conduits etc. until the date of Final Acceptance. The Contractor shall, at its own expense, except as otherwise specified, protect same and maintain them in at least as good a condition as that in which the Contractor finds them. C. All pavements, sidewalks, roads and approaches to fire hydrants shall be kept clear at all times, maintained and repaired to serviceable condition with materials to match existing. 0. Provide and keep in good repair all bridging and decking necessary to maintain vehicular and pedestrian traffic. E. The Contractor shall also remove all snow and ice as it accumulates on the sidewalks within the Contract Limits Lines. 3.21 MAINTENANCE OF PROJECT SITE: A. The Contractor shall take over and maintain all project areas, after order to start work. B. Until the date of Final Acceptance, the Contractor shall be responsible for the safety of all project areas, including water, gas, electric and other mains and pipes and conduits and shall at the Contractor's own expense, except as otherwise specified, protect same and maintain them in at least as good condition as that in which the Contractor finds them. C. All pavements, sidewalks, roads and approaches to fire hydrants shall be kept clear at all times, maintained, and if damaged, repaired to serviceable conditions with materials to match existing. D. The Contractor shall keep the space for the Resident Engineer in a clean condition. 3.22 SAFETY PRECAUTIONS FOR CONTROL CIRCUITS: A. Control circuits, the failure of which will cause a hazard to life and property, shall comply with the New York City Dept. of Buildings, Bureau of Electrical Control requirements.
3.23 OBSTRUCTIONS IN DRAINAGE LINES: A.
The Contractor shall be responsible for all obstructions occurring in all drainage lines, fittings and fixtures after the installations and cleaning of these drainage lines, fittings and fixtures as certified by the Resident Engineer. Roof drains shall be kept clear of any and all debris. Any stoppage shall be repaired immediately at the expense of the Contractor.
END OF SECTION 01 73 00