Flushing Library Contract eBook
Division 01 - DDC STANDARDGENERAL CONDITION SINGLE CONTRACT PROJECTS Issue Date June 01, 2013 Revised - January 15, 2015
-3.,W_ REFER TO THE ADDENDUM FOR THE APPLICABILITY OF SUB-SECTION 3.4 B (2) 2. CONNECTIONTO EXISTINGELECTRICAL POWER SERVICE: a. When approved by the Commissioner, electrical power service for the Temporary Lighting System and for the operation of small tools and equipment less than ¼ horsepower may be taken from the existing electric distribution system if the existing system is of adequate capacity for the temporary power load. The Contractor shall cooperate and coordinate with the facility custodian, so as not to interfere with the normal operation of the facility. b. There will be no charge to the Contractor for the electrical energy consumed. c. The Contractor shall provide, maintain and pay all costs for separate temporary electric power for any temporary power for equipment larger than 1/4 horsepower.When directed by the Commissioner, the Contractor shall remove its own temporary power system. REFER TO THE ADDENDUM FOR THE APPLICABILITY OF SUB-SECTION 3.4 B (3) 3. ELECTRICALGENERATOR POWER SERVICE: a. When connection to Utility Lines or existing facility electric service is not available or is not adequate to supply the electric power need for construction operations, the Contractor shall provide self-contained generators to provide power beyond that available. b. Pay for all energy consumed in the progress of the Work, exclusive of that available from the existing facility or Utility Company. c. Provide for control of noise from the generators. d. Comply with the Ultra Low Sulfur Fuel in Non-Road Vehicles requirements as set forth in Article 5.4 of the Contract. • C. USE OF COMPLETED PORTIONSOF THE ELECTRICALWORK: 1. USE OF MAIN DISTRIBUTIONPANEL: As soon as the permanent electric service feeders and equipment, metering equipment and main distribution panel are installed and ready for operation, the Contractor shall have the temporary lighting and power system changed over from the temporary service points to the main distribution panel. 2. COST OF CHANGE OVER - The Contractor shall be responsible for all costs due to this change over of service and it shall also make application to the Public Utility Company for a watt hour meter to be set on the permanent meter equipment. 3. The requirements for temporary electric power service specified herein shall be adhered to after change over of service until final acceptance of the project. 4. NO EXTRA COST - The operation of the service and switchboard equipment shall be under the supervision of the Contractor, but this shall in no way be interpreted to mean the acceptance of such part of the installation or relieve the Contractor from its responsibility for the complete work or any part thereof. There shall be no additional charge for supervision by the Contractor. REFER TO THE ADDENDUM FOR THE APPLICABILITY OF SUB-SECTION 3.4 D D. TEMPORARY LIGHTINGSYSTEM: 1. The Contractor shall provide adequate service for the temporary lighting system, or a minimum of 100 Amperes, 3-phase, 4-wire service for the temporary lighting system, whichever is TEMPORARY FACILITIES, SERVICESAND CONTROLS 01 50 00 -6
Made with FlippingBook PDF to HTML5