Final Combined Book v.4.0 test
DocuSign Envelope ID: 48D4085A-0190-40E2-8167-8C6D2D73A207
Skanska/Walsh Joint Venture LaGuardia Airport Hangar 5A Runway Drive Flushing, NY 11371
October 25, 2019
Andee Hidalgo Spearhead Construction, LLC PO Box 575 Fort Montgomery, NY 10922
Via Procore: andee@spearheadcx.com
RE: LaGuardia Airport Central Terminal Building Replacement Project (the “ Project ”); Subcontract No. 620-027 (the “ Subcontract ”); SWJV Response to Spearhead’s Construction Change Directives RE: Additional Work 3 rd Floor Escalator Pit .
Ms. Hidalgo:
Skanska/Walsh Joint Venture (“ SWJV ”) is in receipt of the above-referenced letter from Spearhead Construction LLC (“Spearhead”) dated October 23, 2019 regarding cost associated with additional work for a 3 hour wall in lieu of concrete wall at level 3 east escalator wall per RFI PBB-144 Response. SWJV acknowledges additional work for the change in scope and directed Spearhead to perform work in accordance with the RFI response. SWJV does not agree with the proposed lump sum price for this additional scope of work and requests Spearhead to provide detailed estimate per Exhibit C Part 5 Section 3 – Change Notice (on p. 8 of Exhibit C). Time is of the essence to complete work on East and South Escalator Walls. Per contract Exhibit E 10.2 – Change Requests, section (a) Contractor Initiated Change, “Subcontractor shall have no right to suspend or delay the performance of its obligations under the subcontract while Contractor is reviewing Subcontractor’s adjustment request.” SWJV reserves all rights and remedies under the Subcontract.
Sincerely,
Brian Mock Assistant Project Manager
cc.
Frank Corallo -SWJV John Dolan - SWJV
Attached: Spearhead Correspondence No. 40 – Construction Change Directives RE: Additional work at 3 rd Floor Escalator Pit
Page 1 of 1
CB-9505-191023-SWJV Response to Spearhead’s Construction Change Directives.
jb