Final Combined Book v.4.0 test

DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF

EXHIBIT “B” Attachment to Subcontract/Purchase Order No. xxxxxx-xxx dated by and between [insert full legal name of Subcontractor] and Skanska/Walsh JV – Design, Furnish and Install Decorative Formed Metal and Space Heating Radiator Enclosures for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York.

Item No.

Incl. w/ BP/Subcontract

Document

Description

Dated

Revised

246 S72-87-00-00-00

PEDESTRIAN BRIDGE B -ROOF DETAILS II

4/13/2018

247 S72-88-00-00-00

PEDESTRIAN BRIDGE B -ROOF DETAILS III

4/13/2018

PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTIONS NORTH END I PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTIONS NORTH END II PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTIONS NORTH END III PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTIONS NORTH END IV PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTION SOUTH END I PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTION SOUTH END II PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTION SOUTH END III PEDESTRIAN BRIDGE B -BRACED FRAME CONNECTION SOUTH END IV STEEL CONNECTIONS -GENERAL NOTES, SINGLE PLATE DETAIL AND SCHEDULE STEEL CONNECTIONS -DOUBLE ANGLE DETAIL AND SCHEDULE

248 S72-91-00-00-00

4/13/2018

249 S72-92-00-00-00

4/13/2018

250 S72-93-00-00-00

4/13/2018

251 S72-94-00-00-00

4/13/2018

252 S72-95-00-00-00

4/13/2018

253 S72-96-00-00-00

4/13/2018

254 S72-97-00-00-00

4/13/2018

255 S72-98-00-00-00

4/13/2018

256 S82-51-00-00-00

4/13/2018

257 S82-52-00-00-00

4/13/2018

258 S92-01-00-00-00

PEDESTRIAN BRIDGE B -CONSTRUCTION PHASES I

5/12/2017

259 S92-02-00-00-00

PEDESTRIAN BRIDGE B -CONSTRUCTION PHASES II

5/12/2017

260 S92-03-00-00-00

PEDESTRIAN BRIDGE B -CONSTRUCTION PHASES III

5/12/2017

261 S92-11-00-00-00

PEDESTRIAN BRIDGE B -VERTICAL OFFSETS

4/13/2018

HVAC

262 M05-00-00-01-00

MECHANICAL HVAC ABBREVIATIONS AND SYMBOL LIST

5/12/2017 11/30/2018

263 M05-00-00-04-00

MECHANICAL SPECIAL INSPECTIONS

8/10/2018

264 M05-AJ-00-04-00

PEDESTRIAN BRIDGE B HVAC SCOPE OF WORK

4/13/2018

PEDESTRIAN BRIDGE B -LEVEL 4 - MECHANICAL DUCTWORK FLOOR PLAN LOW LEVEL PEDESTRIAN BRIDGE B -LEVEL 4 - MECHANICAL DUCTWORK FLOOR PLAN HIGH LEVEL PEDESTRIAN BRIDGE B -LEVEL 4 - MECHANICAL PIPING FLOOR PLAN LOW LEVEL PEDESTRIAN BRIDGE B -LEVEL 4 - MECHANICAL PIPING FLOOR PLAN HIGH LEVEL PEDESTRIAN BRIDGE B -LEVEL 3 - MECHANICAL DUCTWORK PART PLAN BC

265 M11-AJ-4L-00-6C

4/13/2018 11/30/2018

266 M11-AJ-4L-01-6C

4/13/2018 11/30/2018

267 M12-AJ-4L-00-6C

4/13/2018 8/10/2018

268 M12-AJ-4L-01-6C

4/13/2018 8/10/2018

269 M21-AJ-3L-BC-6C

4/13/2018 11/30/2018

Exhibit B

page 11 of 34

SWJV Pr. No. 1213126-000

Bid Package No./Name

Made with FlippingBook Publishing Software