Final Combined Book v.4.0 test
DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF
EXHIBIT “B” Attachment to Subcontract/Purchase Order No. xxxxxx-xxx dated by and between [insert full legal name of Subcontractor] and Skanska/Walsh JV – Design, Furnish and Install Decorative Formed Metal and Space Heating Radiator Enclosures for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York.
Item No.
Incl. w/ BP/Subcontract
Document
Description
Dated
Revised
SG05 01 00 00 00 (VOID)
172
SIGNAGE GENERAL NOTES AND GUIDELINES
4/13/2018 8/10/2018
173 SG21-AJ-4L-BF-6C PEDESTRIAN BRIDGE B AREA BF - LEVEL 4 -SIGNAGE PLAN
4/13/2018 8/10/2018
174 SG21-AJ-4L-BG-6C PEDESTRIAN BRIDGE B AREA BG - LEVEL 4 -SIGNAGE PLAN
4/13/2018 8/10/2018
175 SG51-00-00-00-00 TYPICAL SIGN TYPES
4/13/2018 11/30/2018
176 SG51-01-00-00-00 TYPICAL SIGN TYPES
4/13/2018 11/30/2018
177 SG60-26-00-00-00 SIGNAGE MESSAGE SCHEDULE (PEDESTRIAN BRIDGE B)
4/13/2018 11/30/2018
178 SG61-21-00-00-00 MESSAGE LAYOUTS (PEDESTRIAN BRIDGE B)
4/13/2018
179 SG80-01-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018 11/30/2018
180 SG80-02-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018 11/30/2018
181 SG80-03-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018 11/30/2018
182 SG80-04-00-00-00 SIGNAGE DETAILS AND SECTIONS
8/10/2018
183 SG80-10-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018 8/10/2018
184 SG80-11-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018 11/30/2018
185 SG80-20-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018 11/30/2018
186 SG80-21-00-00-00 SIGNAGE DETAILS AND SECTIONS
8/10/2018
187 SG80-30-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018 8/10/2018
188 SG80-31-00-00-00 SIGNAGE DETAILS AND SECTIONS
4/13/2018
STRUCTURE
189 S05-AD-01-00-00
ABBREVIATIONS -CONCOURSES AND PEDESTRIAN BRIDGES
5/12/2017
190 S05-AJ-02-00-00
PEDESTRIAN BRIDGE B -GENERAL NOTES
4/13/2018
191 S05-AJ-03-00-00
PEDESTRIAN BRIDGE B -GENERAL NOTES
5/12/2017
192 S05-AJ-11-00-00
PEDESTRIAN BRIDGE B -LOADING PLANS
4/13/2018
PEDESTRIAN BRIDGE B -LEVEL 1 - COMPOSITE FOUNDATION PLAN
193 S11-AJ-1L-00-00
5/12/2017
194 S11-AJ-2L-00-00
PEDESTRIAN BRIDGE B -LEVEL 2 - COMPOSITE FRAMING PLAN 5/12/2017
195 S11-AJ-3L-00-00
PEDESTRIAN BRIDGE B -LEVEL 3 - COMPOSITE FRAMING PLAN 5/12/2017
Exhibit B
page 8 of 34
SWJV Pr. No. 1213126-000
Bid Package No./Name
Made with FlippingBook Publishing Software