Final Combined Book v.4.0 test

DocuSign Envelope ID: 4BC3E417-29A4-409B-8D30-6EBEABF49DBF

EXHIBIT “B” Attachment to Subcontract/Purchase Order No. xxxxxx-xxx dated by and between [insert full legal name of Subcontractor] and Skanska/Walsh JV – Design, Furnish and Install Decorative Formed Metal and Space Heating Radiator Enclosures for Pedestrian Bridge B at LaGuardia Central Terminal Building Replacement Project, Queens, New York.

Item No.

Incl. w/ BP/Subcontract

Document

Description

Dated

Revised

23 G03-03-00-00-00

SITE GEOMETRY PLAN

5/12/2017

24 G03-04-00-00-00

COMPOSITE BUILDING GEOMETRY PLAN

5/12/2017

25 A05-01-00-00-00

GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

4/13/2018

26 A05-02-00-00-00

GENERAL NOTES

4/13/2018

27 A05-11-00-00-00

FINISH, MATERIAL AND SYSTEM SCHEDULE

4/13/2018 11/30/2018

28 A06-01-00-00-00

TERMINAL B - CODE COMPLIANCE SUMMARY

4/13/2018

29 A06-02-00-00-00

TERMINAL B - CODE COMPLIANCE SUMMARY

4/13/2018

30 A06-03-00-00-00

TERMINAL B - CODE COMPLIANCE SUMMARY

4/13/2018

31 A06-04-00-00-00

TERMINAL B - CODE COMPLIANCE SUMMARY

4/13/2018 8/10/2018

32 A06-21-00-00-00

FEMA MAP

5/12/2017

33 A06-22-00-00-00

FEMA MAP

5/12/2017

34 A06-22-00-00-01

FEMA MAP

8/10/2018

35 A06-23-00-00-00

FLOOD MAP

5/12/2017 8/10/2018

36 A06-41-00-00-00

TYPICAL MOUNTING HEIGHT DIAGRAMS

4/13/2018 8/10/2018

OVERALL BUILDING REFERENCE COMPOSITE PLANS (FOR 1"=20'-0")

37 A07-03-00-00-00

5/12/2017

38 A07-04-00-00-00

OVERALL CONSTRUCTION REFERENCE PLAN (FOR 1/8"=1'-0") PEDESTRIAN BRIDGE B -LEVELS 1-4 - COMPOSITE FLOOR PLANS PEDESTRIAN BRIDGE B -ROOF LEVEL - COMPOSITE FLOOR PLAN PEDESTRIAN BRIDGE B -LEVEL 3 - COMPOSITE EXTERIOR SOFFIT PLAN PEDESTRIAN BRIDGE B -LEVEL 1-4 - COMPOSITE REFLECTED CEILING PLAN PEDESTRIAN BRIDGE B -LEVELS 1-4 - COMPOSITE FINISH FLOOR PLAN - PHASE 6C PEDESTRIAN BRIDGE B -LEVELS 1-4 – FIREPROOFING DIAGRAM (FINAL PHASE 6C) PEDESTRIAN BRIDGE B – ROOF LEVEL – FIREPROOFING DIAGRAM PEDESTRIAN BRIDGE B – LEVELS 1-4 – OCCUPANCY AND EGRESS PLAN (FINAL PHASE 6C) PEDESTRIAN BRIDGE B – LEVELS 1-4 – FIRE AND SMOKE CONTROL PLAN (FINAL PHASE 6C)

5/12/2017

39 A11-AJ-4L-00-6C

4/13/2018 8/10/2018

40 A11-AJ-5L-00-6C

4/13/2018 8/10/2018

41 A12-AJ-3L-01-6C

5/12/2017 8/10/2018

42 A12-AJ-4L-00-6C

4/13/2018

43 A13-AJ-4L-00-6C

4/13/2018 11/30//2018

44 A14-AJ-4L-00-6C

4/13/2018 11/30//2018

45 A14-AJ-5L-00-6C

5/12/2017

46 A15-AJ-4L-00-6C

4/13/2018 11/30//2018

47 A16-AJ-4L-00-6C

4/13/2018

Exhibit B

page 2 of 34

SWJV Pr. No. 1213126-000

Bid Package No./Name

Made with FlippingBook Publishing Software