DocuSign Envelope ID: 7C63BD82-420A-491C-9083-158B7A040299
EXHIBIT “C” Attachment to Agreement No. 1213126J-000.620027, dated July 16, 2018 , by and between SPEARHEAD CONSTRUCTION LLC and Skanska Walsh Design-Build JV for Furnish and Install Building Framing and Partitions for Pedestrian Bridge B at LaGuardia Airport Central Terminal Building Replacement Project, New York, LaGuardia Airport Queens, New York . 2. Work sourced through M/WBE classified Subcontractors or Suppliers to meet the M/WBE goals. A. State Work categories and anticipated Price range of each. B. Confirm anticipated M/WBE percentage (%) range of overall GMP to be M/WBE. C. Name firms if source is known, or confirm selection through Bid process. 3. If multiple firms are being considered for same work at time of proposal, Subcontractor shall state list firms considered. Final assignment and selection will be made before Construction Services Subcontract is issued.
Name of Firm Anticipated
M/WBE check if “YES”
Work Category
%
Price Range
PART 4 – RATES FOR CHANGES:
The Subcontract Agreement Article X of Exhibit E of the Subcontract Agreement and Appendix attached and all subsections contained therein, includes the applicable statements for rules and procedures for Changes Orders, calculating Labor Rates for Changes, mark-up percentages for Overhead and Profit. 4.A – CHANGE ORDER MARKUP RATES Subcontractor represents the change order markup is Subcontractor’s total compensation for which Subcontractor will add or deduct, as applicable, to the cost of materials, equipment, labor, approved rentals, services, supervision, and other direct costs that may be included by definition in the cost of the Change Order. Percentages will be the maximum aggregate markup allowed for Subcontractor’s and its 2 nd tier Subcontractor’s total cost shall not exceed the Maximum Overhead & Fee percentages stated in attached Exhibit C Appendix, Section 5.
4.B - UNIT PRICES:
The following Unit Prices are totally inclusive of whatever is required to complete each item in its entirety, including but not limited to all overhead, profit, estimating, engineering, supervision, design, detailing, delivery, layout, furnishing, installing and all requirements of the Subcontract Agreement for such items. Unit Prices may be utilized by Skanska-Walsh for any changes, additions or deletions to the work at any time for the duration of the Subcontract Agreement.
Partition Type
Unit Price
Wall Type 1A6AS Wall Type 0Z6 Wall Type 0F6B Wall Type 2B6 Wall Type 2B6ABS Wall Type 1A6AB
$17.98/SF $16.10/SF $10.12/SF $17.20/SF $19.29/SF $19.51/SF
Exhibit C, Page 4 of 10
LGA (Subcontract) Alternates, Unit Prices, and Labor Rates
Version 4.0
(07.18.2018 ed. Rev. 0)