Final Combined Book v.4.0 test

Field Note

When: 8/24/2019, 6:42 am

LGA - 620-027 — LGA CTB Replacement - PBB

Text it's Saturday on the third floor that still cleaning up the fire proofing where they pulled the pads week and they're going to bloom are left up sometime today hopefully and they might have to put two lifts on the third floor one for each side because where they put the poured the pads it's hard to make the turn.so there's an I-beam on the other side of the pass so we can't go that way so this is the only path to get around the elevators so I believe the best thing is to have a lift on each side,I spoke with Brian and Zack and they seem to be in agreement for now we're going to get our lift up and we're going to try to make the turn.