LaGuardia CTB Replacement Project Pedestrian Bridge B – Additional Interior Framing Items Meeting Minutes ______________________________________________________________________________________

Date: Wednesday, October 8, 2019

Time: 10:00am – 12:00 pm EST

Location : Pedestrian Bridge B Trailer

Attendees:

Attendance Name

Company

Email

Phone #

Brian Mock

SWJV

X

Frank Corallo

SWJV

X

Mackenzie Kirby

SWJV

X

Zachary Trause

SWJV

X

Bill Carson

SWJV

X

Murat Belgin

SWJV

X

Sean Hickey

SWJV

Andee Hildago

Spearhead

Sean Reed

Spearhead

X

Gary Miuccio

Spearhead

X

1. Engineering Items a. Roof Access Corridor: Type Z wall. Has Tube Steel inside wall. Alternate Detail? SWJV to send detail of same wall type at HH. b. North Flair Curved Soffit at Curtain Wall. How is this framed? Spearhead to look at details c. Level 3 Mech. Room South: MEP Penetrations, Multiple beam penetrations, gusset at floor. Spearhead will frame elevator after weld signoff, anticipated start 10/12/19. South Wall to start after elevator d. Knee Wall at level 4 escalator pit Located in the upper escalator pit wall on the west. Need installed prior to Kone load in. e. Elevator Shaft Walls. How are the corners being framed. Running drywall by tube steel, can using furing if needed.

f. Stair wall engineering (10psf) – see meeting minutes g. Feature wall seismic requirements – see meeting minutes h. Blue Banger Hanger calculation – see meeting minutes

2. 4 th Floor Items a. What needs to be complete prior to starting GFRG Capitals and GFRC Bases i. 1. Finish Truss Framing by 10/18/19. ii. 2. GFRG Pieces and capital framing simultaneous install starting 10/18/19 iii. 3. Set Ceiling Soffit Clips and Grid iv. 4. GFRC bases