LaGuardia CTB Replacement Project Pedestrian Bridge B – Additional Interior Framing Items Meeting Minutes ______________________________________________________________________________________
Date: Wednesday, October 8, 2019
Time: 10:00am – 12:00 pm EST
Location : Pedestrian Bridge B Trailer
Attendees:
Attendance Name
Company
Phone #
Brian Mock
SWJV
X
Frank Corallo
SWJV
X
Mackenzie Kirby
SWJV
X
Zachary Trause
SWJV
X
Bill Carson
SWJV
X
Murat Belgin
SWJV
X
Sean Hickey
SWJV
Andee Hildago
Spearhead
Sean Reed
Spearhead
X
Gary Miuccio
Spearhead
X
1. Engineering Items a. Roof Access Corridor: Type Z wall. Has Tube Steel inside wall. Alternate Detail? SWJV to send detail of same wall type at HH. b. North Flair Curved Soffit at Curtain Wall. How is this framed? Spearhead to look at details c. Level 3 Mech. Room South: MEP Penetrations, Multiple beam penetrations, gusset at floor. Spearhead will frame elevator after weld signoff, anticipated start 10/12/19. South Wall to start after elevator d. Knee Wall at level 4 escalator pit Located in the upper escalator pit wall on the west. Need installed prior to Kone load in. e. Elevator Shaft Walls. How are the corners being framed. Running drywall by tube steel, can using furing if needed.
f. Stair wall engineering (10psf) – see meeting minutes g. Feature wall seismic requirements – see meeting minutes h. Blue Banger Hanger calculation – see meeting minutes
2. 4 th Floor Items a. What needs to be complete prior to starting GFRG Capitals and GFRC Bases i. 1. Finish Truss Framing by 10/18/19. ii. 2. GFRG Pieces and capital framing simultaneous install starting 10/18/19 iii. 3. Set Ceiling Soffit Clips and Grid iv. 4. GFRC bases
Page 1
Pedestrian Bridge B – Additional Interior Framing Items