BCM Additional Labor Costs Due to Covid
Message 4: Friday, June 26, 2020 9:46 AM
From: Stavros Karanikolas
Good Morning Sean,
The new structural steel members that need to be elevated and welded to the existing building steel intended to carry the two cruciforms and the post are substantial in size. It may be prudent to schedule a coordination meeting with the steel contractor before carpentry commences to make sure their means and methods for erecting the steel and fastening in place are not obstructed by added work to the space. The roof structural steel intended to carry the post in the S/W corner of the room spans N to S and is awfully close to the stage framing.
Thank You
Stavros Karanikolas
XBR Inc. 35-12 19 th Avenue Suite 2E
Astoria, NY 11105 T: 718-606-0072 C: 917-651-9723 F: 718-889-2229 E:skaranikolas@xbrinc.com www.xbrinc.com