BCM Additional Labor Costs Due to Covid

Message 4: Friday, June 26, 2020 9:46 AM

From: Stavros Karanikolas Sent: Friday, June 26, 2020 9:46 AM To: Carlos Quezada Arauz ; Sean ; Gary Cc: Andee ; Peter Lambrakis (XBR) ; Michael Kourris (XBR) ; Sean Bronson (XBR) ; Rose Ott ; Project: Brooklyn Children's Museum Subject: RE: PV262-AUD Carpenter Notice to Proceed to Start Framing

Good Morning Sean,

The new structural steel members that need to be elevated and welded to the existing building steel intended to carry the two cruciforms and the post are substantial in size. It may be prudent to schedule a coordination meeting with the steel contractor before carpentry commences to make sure their means and methods for erecting the steel and fastening in place are not obstructed by added work to the space. The roof structural steel intended to carry the post in the S/W corner of the room spans N to S and is awfully close to the stage framing.

Thank You

Stavros Karanikolas

XBR Inc. 35-12 19 th Avenue Suite 2E

Astoria, NY 11105 T: 718-606-0072 C: 917-651-9723 F: 718-889-2229 E:skaranikolas@xbrinc.com www.xbrinc.com

Back to message list

Made with FlippingBook. PDF to flipbook with ease